Pencarian berdasarkan :
Pencarian terakhir:
— Hutchings, Jonathan F. - Nama Orang;
The CPM Construction Scheduler's Manual by Jonathan F. Hutchings serves as a comprehensive guide for construction project schedulers, emphasizing the critical role of effective scheduling in ensuring project profitability and success. The manual delves into critical path management (CPM), construction and contract law, preconstruction planning, network scheduling and diagramming, project operations, OSHA inspections, risk management, scheduling contingencies, and software applications. Notably, it includes a lite version of the FastPro CPM Scheduler software, enabling users to create professional-quality schedules, reports, and related documents. The manual also offers insights into construction management methods, addressing topics such as fast-tracking, design-build approaches, dispute resolution, and project safety, providing schedulers with a well-rounded understanding of both scheduling techniques and broader construction management practices.
Ketersediaan
| 2020907827-1 | REF 658.404 016 HUT c C/1 | Perpustakaan Pusat (Koleksi Referensi) | Tersedia namun tidak untuk dipinjamkan - Tersedia (Tidak Dipinjamkan) |
| 2020907827-2 | REF 658.404 016 HUT c C/2 | Perpustakaan Pusat (Koleksi Referensi) | Tersedia namun tidak untuk dipinjamkan - Tersedia (Tidak Dipinjamkan) |